Architect
Kang Yerin (Seoul National University), SoA (Lee Chihoon, Han Joohee)
Design team
Jeong Yuri, Lee Jeongyeon, Lee Yoonseok, Kim Jungmin, Kim Yoonji
Location
277-34, Seongsu-dong 2-ga, Seongdong-gu, Seoul, Korea
Programme
industrial facility, office
Site area
559m2
Building area
335.25m2
Gross floor area
2,179.97m2
Building scope
B2.7F
Height
27.95m
Parking
16
Building to land ratio
59.97%
Floor area ratio
389.94%
Structure
RC, steel frame
Exterior finishing
brick, GI, exposed concrete, glass
Interior finishing
brick, exposed concrete
Structural engineer
Base Structural Consultants
Construction
Save Co., Ltd.
Mechanical engineer
Jusung ENG
Electrical engineer
Hangil Engineering
Landscape architect
Aliveus
Design period
May 2019-Feb. 2020
Construction period
June 2020 – Apr. 2023
Construction budget
6.2 billion KRW
Client
Seoul Metropolitan Government
Kang Yerin + SoA
설계
강예린(서울대학교), 건축사사무소 에스오에이(이치훈, 한주희)
설계담당
정유리, 이정연, 이윤석,…